Wuxi Center 66, Phase I – Office Tower II

Location
Wuxi, China
Site Area
37,324 sqm
GFA
69,288 sqm
Client
Hang Lung Properties Ltd.

Located in Wuxi’s commercial Liangxi district, Wuxi Center 66, Phase I – Office Tower II contains 21 office levels built above a six-storey podium mall, featuring interlocking volumes. Dynamically arranged vertical fins not only promotes linearity on the external facades, but are also part of the sustainability design which improves insulation and saves energy for air-conditioning. The project also promotes a greener workplace with common gardens inserted at various levels along the height of the building.

The emphasis on linearity has been extended from building exteriors to the interior office space for a sense of unity. White marble walls are vertically laced with steel strips, in bright contrast with dark grey flooring and resonated by a feature wall in the entrance lobby. Building systems are designed to be digitally adaptive for the benefit of smarter operations.

1/4

Winning Awards

14th Kinpan Awards
Best Office of the Year (Fujian-Shenzhen Divisions)